Projects

Training Equipment Systems

 

 

Project name:
Training Equipment Systems
Project name:
PVMTC
Year of Completion:
2014
Location:
S.R. Vietnam
Scope of work:
Calculating, Engineering and Fabrication the Basic System, Pumping System, Three Phase Separator, Heat exchanger System, Distillation system.

Information is being updated:

»  
Fabricating Tube Bundle Air Cooler
»  
Fabricating the Start-up Filter
»  
Hai Phong Terminal
»  
Fabricating the Gas Filter
»  
Fabricating the Cooler Water-Air Heat Exchanger
Follow us on:
Copyright © 2011 DK Engineering J.S.C. All rights reserved. Designed by Fibo