Projects

HST Full Field Development & HSD Early Production System Development

 

Project: HST Full Field Development & HSD Early Production  System Development
Client: Thang Long JOC
Year 2012
Location: Block  15-2/01 offshore Vietnam

 

Information is being updated:

»  
Fabricating Tube Bundle Air Cooler
»  
Fabricating the Start-up Filter
»  
Hai Phong Terminal
»  
Fabricating the Gas Filter
»  
Fabricating the Cooler Water-Air Heat Exchanger
Follow us on:
Copyright © 2011 DK Engineering J.S.C. All rights reserved. Designed by Fibo