Projects

HST Full Field Development & HSD Early Production System Development

 

Project: HST Full Field Development & HSD Early Production  System Development
Client: Thang Long JOC
Year 2012
Location: Block  15-2/01 offshore Vietnam

 

Information is being updated:

»  
Fabricating the tube bundle for air cooler (PVCFC)
»  
Fabricating the tube bundle for air cooler(PV GAS)
»  
Fabricating the air cooler
»  
GPP Ca Mau
»  
Ammonia Plant Revamp
Follow us on:
Copyright © 2011 DK Engineering J.S.C. All rights reserved. Designed by Fibo