Projects

Dai Hung Phase II Project

 
  
 
Project name: Dai Hung Phase II Development
Client: PetroVietnam Exploration Production Corporation – PVEP
Year of Completion: 2009
Location: Block 05-1A, Con Son Basin, offshore Vietnam
Scope of work: Provision of engineering design for the Gas Filter, Gas Scrubber, Flare Scrubber, Test Separator, HHP separator, Corrosion Inhibitor & Demulsified , Pour Point Depressant

 

Information is being updated:

»  
Fabricating Tube Bundle Air Cooler
»  
Fabricating the Start-up Filter
»  
Hai Phong Terminal
»  
Fabricating the Gas Filter
»  
Fabricating the Cooler Water-Air Heat Exchanger
Follow us on:
Copyright © 2011 DK Engineering J.S.C. All rights reserved. Designed by Fibo