Projects

Bien Dong Phase 1- Fuel Gas Skid

 

Project: BIEN DONG PHASE 1-  FUEL GAS SKID ( MT1-SK-4010)
Client: BIen Dong P.O.C
Year 2011
Location: Offshore Vietnam

Information is being updated:

»  
Fabricating Tube Bundle Air Cooler
»  
Fabricating the Start-up Filter
»  
Hai Phong Terminal
»  
Fabricating the Gas Filter
»  
Fabricating the Cooler Water-Air Heat Exchanger
Follow us on:
Copyright © 2011 DK Engineering J.S.C. All rights reserved. Designed by Fibo