Projects

  

Project:

PLEM VALVE REPLACEMENT

Client:

JGCS Consortium

Year:

2016

Scop of work:

Mechanical calculation for pipe spool and clamp

Information is being updated:

»  
Fabricating the tube bundle for air cooler (PVCFC)
»  
Fabricating the tube bundle for air cooler(PV GAS)
»  
Fabricating the air cooler
»  
GPP Ca Mau
»  
Ammonia Plant Revamp
Follow us on:
Copyright © 2011 DK Engineering J.S.C. All rights reserved. Designed by Fibo